Thursday, April 8, 2010

Second Floor - East Wall


The entire second floor will be home to the Adult/Teen Department in the renovated library. The new computer lab is to the right in the photo.

First Floor - North Wall


The north half of the main floor will be the home of the Children's Department in the renovated library.

Thursday, April 1, 2010

Interior Work Continues


Materials are arriving for main floor interior work.

The new computer lab will be located on the second floor.

Thursday, March 18, 2010

Workers in Action - East side of the building

Natural Lighting - one week later


Progress continues as some of the exterior wall on the north side has been removed to accomodate the flow of natural light in the library after the renovation.

Thursday, March 11, 2010

Natural Lighting




Window openings are being cut to allow natural light to filter in from all directions. This photo was taken on Mulberry Street on the north side of the library building.

Wednesday, March 3, 2010

Taking Shape



This photo shows metal studs framing administrative offices that will be located in the lower level of the renovated library.
This captures the old "Main Entrance" on Union Street that has now been sealed off. The stairway visble to the left will be removed once the new stairway is installed connecting all three levels.